Door Industry Journal - Winter 2014
Also online at: www.dijonline.co.uk 62 THE door industry journal winter 2014 entrance doors feature Designed by RHWL Architects, the recently completed 143 bedroom, £12.5 million Premier Inn development is located on a half acre site at the corner of Irwell Street and Stanley Street. The development includes a bar and restaurant which capitalises on its south facing riverside location. The new hotel and restaurant, are located within the new ‘Chapel Street’ development and will support the nearby recently completed Grade A office and commercial properties at the ‘New Bailey’ development. Both developments make up the £650 million ‘Salford Central’ scheme. Salford Central, which is made up the two inter- dependent, but distinct areas, will create around 11,000 new jobs and will provide 220,000 square metres of commercial space, 849 new homes and in total provide 390 hotel rooms. Entrance doors on commercial schemes such as the Premier Inn, Salford Central, are in use constantly, 7 days a week, 52 weeks of the year. Both the door system used and the operating gear has to be capable of withstanding such traffic, including to some extent an amount of abuse due to poorly handled luggage. The sliding door system chosen for the installation on the project comes from the Aluprof portfolio of commercial systems. The MB-DPA system which is a dedicated range of aluminium profiles specifically designed for use in heavy duty commercial sliding door sets. As the project had to achieve both high levels of insulation as well as high levels of sound attenuation, as it is located on a busy route into the city of Manchester, specialist DG units were specified on the project which included 14.4 mm sound control laminated glass made up into double and triple glazed units. The MB-DPA system is capable of carrying units up to 37 mm in width and is optionally thermally broken using polyamide strips. Other ground floor swing doors on the project were constructed using Aluprof’s MB 86 ST system, which is a high thermal performance rebated window/door system which meets the high specification required on the project. These doors are a mix of ground floor panelled access doors and glazed fire escape doors. All door systems were powder coated to RAL 9010 matt. Sound attenuation was further enhanced in the bedrooms where triple glazing was required using 8.4 mm sound control laminated glass in a unit which was almost 50mm in thickness. Aluprof’s MB TT50 was chosen for this application as it also offers a high level of frame insulation to complement the high acoustic and insulation performance of the DG unit. All windows were dual colour with matching RAL 9010 matt outside with RAL 7022 matt internally. The corner detailed curtain wall areas were made from ‘Making an Entrance’ Offering some of the highest insulation levels achievable in commercial aluminium doors and windows, Aluprof have recently supplied systems for the new Premier Inn in Salford Central, Manchester.
Made with FlippingBook
RkJQdWJsaXNoZXIy Mzg2Nzk=